<bdo id="giq33"></bdo><noframes id="giq33"><rt id="giq33"></rt><rt id="giq33"><rt id="giq33"></rt></rt><noframes id="giq33"><rt id="giq33"></rt><noframes id="giq33"><noframes id="giq33"><noframes id="giq33"><rt id="giq33"><delect id="giq33"></delect></rt><noframes id="giq33"><rt id="giq33"></rt><noframes id="giq33"><rt id="giq33"></rt> <rt id="giq33"></rt><noframes id="giq33"><rt id="giq33"><delect id="giq33"></delect></rt><noframes id="giq33"><noframes id="giq33"><noframes id="giq33"><noframes id="giq33"><noframes id="giq33"><rt id="giq33"></rt><noframes id="giq33"><noframes id="giq33"><rt id="giq33"></rt><delect id="giq33"></delect> <rt id="giq33"></rt><rt id="giq33"><rt id="giq33"><delect id="giq33"></delect></rt></rt><noframes id="giq33"><rt id="giq33"><delect id="giq33"></delect></rt><noframes id="giq33"><noframes id="giq33"><noframes id="giq33"><rt id="giq33"></rt>
 招標網首頁 | 招標 招標公告 中標公告 招標文件下載 免費公告 近期招標 | 項目 擬在建項目 VIP獨家項目 業主委托項目 | 企業 業主 供應商 招標機構 | 資訊 項目動態
 
當前位置: 首頁 > 歷年招標公告 > 2022.05.03招標公告 > 福州市三江口植物園方案設計國際招標公告FuzhouSanjiangkouBotanicalGardenDesignProjectInternationalTenderNotice

福州市三江口植物園方案設計國際招標公告FuzhouSanjiangkouBotanicalGardenDesignProjectInternationalTenderNotice

招標文件下載
信息發布日期:2022.05.03 標簽: 福建省招標 
加入日期:2022.05.03
截止日期:2022.06.01
招標業主:福州市建設發展集團有限公司
招標代理:泉州市工程咨詢中心有限公司
地 區:福建省
內 容:項目概況 ***三**植物園方案設計國際招標Fuzhou Sanjiangkou Botanical Garden Design Project International Tender 招標項目的潛在資格預審申請人應在詳見附件領取資格預審文件,并于****年**月**日 **點**分 (**時間)
 
招標公告正文

 

項目概況 福州市三江口植物園方案設計國際招標Fuzhou Sanjiangkou Botanical Garden Design Project International Tender 招標項目的潛在資格預審申請人應在詳見附件領取資格預審文件,并于2022年05月25日 17點30分 (北京時間)前提交申請文件。

一、項目基本情況

項目編號:/

項目名稱:福州市三江口植物園方案設計國際招標Fuzhou Sanjiangkou Botanical Garden Design Project International Tender

采購方式:公開招標

預算金額:580.0000000 萬元(人民幣)

采購需求:

詳見附件

合同履行期限:詳見附件

本項目(  接受  )聯合體投標。 詳見附件

二、申請人的資格要求:

1.滿足《中華人民共和國政府采購法》第二十二條規定;

2.落實政府采購政策需滿足的資格要求:

3.本項目的特定資格要求:詳見附件

三、領取資格預審文件

時間:2022年05月03日 至 2022年05月13日,每天上午8:00至12:00,下午12:00至17:30。(北京時間,法定節假日除外)

地點:詳見附件

獲取資格預審文件的方式:詳見附件

四、資格預審申請文件的組成及格式

詳見附件

五、資格預審的審查標準及方法

詳見附件

六、擬邀請參加投標的供應商數量

邀請全部通過資格預審供應商參加投標。

七、申請文件提交

應在 2022年05月25日 17點30分 (北京時間)前,將申請文件提交至詳見附件。

八、資格預審日期

資格預審日期為申請文件提交截止時間至2022年05月26日前

九、公告期限

自本公告發布之日起5個工作日。

十、其他補充事宜

《福州市三江口植物園方案設計

國際招標公告

Fuzhou Sanjiangkou Botanical Garden Design Project

International Tender Notice

 

根據福州市政府、福州市園林中心的相關文件,福州市建設發展集團有限公司面向全球開展《福州市三江口植物園方案設計》公開招標(以下簡稱“本次招標”)?,F將相關事項公告如下:

According to the relevant documents of Fuzhou Municipal Government and Fuzhou City Garden Center, Fuzhou Construction Development Group Co., Ltd. is launching a global public tender for the "Fuzhou Sanjiangkou Botanical Garden Design Project" (hereinafter referred to as "the tender"). The relevant matters are announced as follows:

一、項目背景I. Project Background

2021年3月24日,習近平總書記在福州福山郊野公園視察時說到“福州是有福之州,生態條件得天獨厚;福州要把山水城市建設好,希望有福之州,更好的造福于民,而且能對我們的國家,做出更大的貢獻!”福州地處淺山沿海地帶,海陸交錯,地理上跨越兩個氣候帶和植被分區,得天獨厚的山水生態本底與氣候條件,生態系統多樣,生物多樣性資源豐富。福州還擁有豐富多元的歷史文化,面向未來正在建設現代化國際城市,推動城市高質量發展。

On March 24, 2021, General Secretary Xi Jinping visited Fuzhou Fushan Country park and said, "Fuzhou, as its name, is a blessed city with unique ecological conditions; Fuzhou should build a city with mountains and water, hoping that a blessed state will better benefit the people and make a greater contribution to our country!" Fuzhou is located in the coastal area of shallow mountains, where the sea and land are interlaced, and geographically spans two climatic zones and vegetation divisions , it has a unique landscape ecological background and climatic conditions, diverse ecosystems and rich biodiversity resources. Fuzhou also has a rich and diverse history and culture, and is building a modern international city for the future, so as to promote high-quality urban development.

 

圖1 三江口城市設計

Figure 1 Sanjiangkou Urban Design

 

三江口片區是福州新區核心區,是福州“東進南下”的發展軸線中部重要節點、沿江向海發展的重要跳板、福州城市的“水陸門戶”,該片區“三江匯流、山城相融”,具有獨特而典型的山水城市格局,山地、平原、濕地、河口,地貌類型豐富多樣。在三江口片區建設植物園,使植物園建設與三江口片區提升共同發展,將充分彰顯山水城市形象、推動新城建設、完善綠地系統結構、連通區域綠道網絡,為生物多樣性保護、可持續發展、提升廣大民眾提高科學素養貢獻力量。

Sanjiangkou area is the core area of Fuzhou New District, which is an important node in the middle of Fuzhou's development axis of "east to south", an important springboard for development along the river to the sea, and the "land and water gateway" of Fuzhou city. The area has a unique and typical landscape urban pattern, with mountains, plains, wetlands, estuaries, and a rich variety of landform types. The construction of the botanical garden in the Sanjiangkou area, making the construction of the botanical garden and the enhancement of Sanjiangkou area develop together, which will fully highlight the image of the landscape city and promote the construction of the new city; improve the structure of the green space system, connect the regional greenway network, and contribute to biodiversity conservation, sustainable development, and encourage the general public to improve their scientific literacy and make a contribution.

植物園建設擬借鑒國內外優秀設計理念和成功經驗,總體遵循五大原則:1)生態優先,因地制宜;2)城園同構,聯結成網;3)特色鮮明,差異發展;4)合理開發,自身造血;5)統籌部署,分步實施。為滿足植物園從國際視角高起點設計、高標準建設,探索可持續運營模式,現就福州市三江口植物園方案設計開展國際招標。

The construction of the botanical garden is intended to learn from excellent design concepts and successful experiences at home and abroad, and five major principles should be followed: (i) put ecology first, adjust measures to local conditions; (ii) the garden should be considered with the city, and build a network; (iii) achieve differential development according to distinctive features; (iv) develop reasonably and has its own hematopoietic ability ; (v) overall depolyment, step by step implementation. In order to meet the high starting point design and high standard construction of the botanical garden from an international perspective and to explore sustainable operation mode, international public tender is now carried out for the scheme design of Sanjiangkou Botanical Garden in Fuzhou.

二、設計范圍及內容II. Design Scope and Content

(一)規劃與研究范圍

IPlanning and Research Scope

規劃范圍:福州市三江口植物園(暫命名)擬選址于三江口片區清涼山、城門山,其中,清涼山總面積約315公頃、城門山面積約349公頃,共計664公頃(圖2)。

Planning scope: Fuzhou Sanjiangkou Botanical Garden (Temporary name) is proposed to be located in Qingliang Mountain and Chengmen Mountain in Sanjiangkou Area. The area of Qingliang Mountain is about 315 hectares and the area of Chengmen Mountain is about 349 hectares, total area is 664 hectares (Figure 2).

 

圖2 規劃范圍

Figure 2 Planning Context

研究范圍:以植物園開發建設為契機,統籌考慮與周邊地塊協同規劃的有效路徑。研究范圍以植物園用地為核心,擴展其周邊用地(圖3)的功能及城市空間形態,總面積約41平方公里,重點梳理與鐵頭山、南湖城市軸線、火車南站樞紐以及三江口片區慢行系統的關系,強化植物園與城市景觀風貌的協調和功能的相輔相成。

Scope of the study : Taking the development and construction of the botanical garden as an opportunity, consider the effective path of synergistic planning with the surrounding parcels . The scope of the study takes the botanical garden site as the core and extends the functions and urban spatial forms of its surrounding sites (Figure 3), with a total area of about 41 square kilometers, focusing on sorting out the relationship with Tietou Mountain, the urban axis of South Lake, the hub of South Railway Station and the slow-moving system of Sanjiangkou area, and strengthening the coordination of the botanical garden and the urban landscape and the complementary functions.

 

圖3研究范圍

Figure 3 Scope of the study

(二)規劃設計目標及內容

IIPlanning and design objectives and content 

1、設計目標

I. Design objectives

(1)對標一流、國際視野

iBenchmarking against first-class, international vision

在彰顯福州地域特色、山水格局和地帶性植物資源的前提下,響應建設現代化國際城市新城核心區的總體要求,結合三江口片區交通樞紐、藝術高地、城市門戶、國際交流集中區等優勢,通過特色專類園、數字植物園、文旅植物園等多種建設方式,打造一個開放多元國際一流的植物園及周邊城市功能。同時把植物生物多樣性的概念引入片區其他的公共開放空間,構建三江口泛植物園生態游覽區域,最終形成具有豐富的生物多樣性、宜居的、具有特色的全球獨一無二的三江口城市會客廳。

On the premise of highlighting Fuzhou's regional characteristics, landscape pattern and zonal botanical resources, responding to the overall requirement of building the core area of a modern international urban new city, and combining the advantages of the transportation hub, art highland, urban gateway and international exchange concentration area in the Sanjiangkou area, an open and diversified international first-class botanical garden and the surrounding city functions shall be created through various construction methods such as the characteristic special garden, digital botanical garden and cultural tourism botanical garden. At the same time, the concept of plant biodiversity shall be introduced into other public open spaces in the area to build a pan-botanical garden ecological tour area of Sanjiangkou, which shall eventually form a globally unique Sanjiangkou city living room with rich biodiversity, livability and characteristics.

(2)準確定位、突出特色

iiAccurate positioning and outstanding features

高水平植物園必須具備有競爭力的資源和品牌。通過對國內外重要植物園及本地區植物專類公園的競合分析,結合本項目地理、氣候、立地條件分析,提出三江口植物園的差異化發展方向,明確定位,展現特點,在實現科學研究、生態修復、科普教育、休閑娛樂于一體的目標前提下,提出具有競爭力的獨特的植物種類、展陳方式、特色資源和風景特色等。

High-level botanical gardens shall have competitive resources and brands. Through competitive analysis of important botanical gardens at home and abroad and plant-specific gardens in the region, combined with the analysis of geography, climate and site conditions of this project, the differentiated development direction of Sanjiangkou Botanical Garden shall be proposed to clearly position itself, show its characteristics, and put forward competitive and unique plant species, exhibition methods, characteristic resources and scenic features, etc.

(3)山水形勝、城園相融

iiiMountain and water scenery, city and garden in harmony

塑造鮮明特色的山水城市的風景式植物園。為響應福州建設山水城市,打造生態文明造福于民的典型,三江口植物園應依托特有的山、水、新城的空間格局,充分發揮植物園外溢效應,并綜合考慮三江口片區的高鐵樞紐、會展中心、藝術中心、城市山水門戶的特殊功能和定位,提出契合一園多區的“布局、建設、運營”方式,“園與城”融合,實現與周圍城市用地的優勢互補與資源整合,營造獨具特色的山水城市風景式植物園,引領福州現代化國際城市“三江口片區”的建設。

Shaping a scenic botanical garden with distinctive characteristics of a landscape city. In response to Fuzhou's construction of a landscape city and to create a typical ecological civilization for the benefit of the people, Sanjiangkou Botanical Garden shall rely on the unique spatial pattern of mountains, water and new cities, give full play to the spillover effect of the botanical garden, and take into account the special functions and positioning of the Sanjiangkou area as a high-speed railway hub, exhibition center, art center and urban landscape gateway, and propose a "layout, construction, and operation" approach that fits the garden with multiple zones . The garden shall be integrated with the city to achieve complementary advantages and resource integration with the surrounding urban land, create a unique landscape botanical garden for a landscape city, and lead the construction of "Sanjiangkou Area" of Fuzhou modern international city.

(4)分期有序、彈性發展

ivPhased orderly and develop flexibly 

植物園是一個長期建設和積累的項目,非一撮而就,制定彈性發展的路徑,要有合理的分期,又要有彈性的發展余地。重點分析三江口的規劃,銜接片區建設時序,確定分期建設的計劃,綜合考慮交通、資金、特色展示、城區建設銜接等因素,合理比選啟動區(一期項目,不少于100公頃),并對植物園一期項目制定修建性詳細規劃方案(方案設計)。

The construction of botanical garden is a long-term and accumulation project, which is not just a handful. The elastic development path shall be formulated with reasonable stages and have flexible room for growth. Focus on analyzing the planning of Sanjiangkou, articulating the timing of the construction of the area, determining the plan of phased construction, taking into account factors such as transportation, funding, feature display, and urban construction connection, etc., reasonably comparing the start-up area (Phase I project, not less than 100 hectares), and formulating a detailed construction planning plan for the first phase of the botanical garden project(scheme design).

(5)建、管、營一體,可持續發展

vConstruction, management and operation as a whole, sustainable development

植物園建設和運行需要有長期穩定的資金投入,為適應“市場化”建設運營管理模式的要求,三江口植物園需在滿足基本功能的前提下,引入可持續運營發展理念進行規劃設計,通過社會資本引入,科普和文、體、商、旅相結合,科研和產業相互輔助,籌集資金、創造收入,使植物園實現健康良性的運行,實現長久的可持續發展。

As the construction and operation of the botanical garden requires long-term stable capital investment,in order to meet the requirements of the "market-oriented" construction and operation management mode, the Sanjiangkou Botanical Garden shall introduce the concept of sustainable operation and development for planning and design under the premise of satisfying the basic functions, and through the introduction of social capital, combining science and popularization with culture, sports, business and tourism, scientific research and industry, the botanical garden shall raise funds and generate income to achieve healthy and benign operation and realize long-term sustainable development.

2、設計內容

II. Design content

總體規劃設計內容包括植物園功能定位與發展策略、三江口片區園城融合發展建議、植物園總體設計、生境保護與營造設計、專類園總體布局、植物園生態旅游策劃、露地專類園植物設計、溫室植物設計、建筑設計、道路交通及慢行系統設計、導覽及標識設計、運營管理體系設計、建設時序、植物園一期建設范圍以及方案設計、投資估算等內容。

The overall planing and design shall include the functional positioning and development strategy of the botanical garden, the development proposal of the integration of the garden and city in the Sanjiangkou area, the overall design of the botanical garden, the design of habitat protection and construction, the general layout of the special garden, the ecotourism planning of the botanical garden, the design of plants in the open field special garden, the design of greenhouse plants, the architectural design, the design of road traffic and slow traffic system, the design of guide and signage, the design of operation management system, the construction timing, the scope and detailed design of the first phase of the botanical garden, the scheme design and the investment estimate, etc.

1)三江口片區園城融合發展建議

iSuggestions for integrated development of the garden and city in the Sanjiangkou area

通過研究范圍的總體研究,重點梳理植物園與鐵頭山、南湖城市軸線、火車南站樞紐及周邊開放空間之間的聯系,巧妙構建相互之間連接的慢行廊道及城市活力帶,尤其是清涼山、城門山與南湖城市軸線之間的通廊,使之成為植物園整體有機組成的部分。并統籌考慮片區的會展中心、藝術中心、歷史街區等城市功能,提出契合“園城融合”、“一園兩區”的植物園“布局、建設、運營”方式,同時把植物生物多樣性的概念引入片區其他的公共開放空間,構建三江口泛植物園生態游覽區域,最終形成具有豐富的生物多樣性、宜居的、具有特色的全球獨一無二的三江口城市會客廳。制定切實可行的交通銜接方式、用地調整策略、運營管理方式、旅游開發路徑等,使植物園建設能夠與三江口片區提升共謀發展,推進三江口片區實現從交通樞紐到世界級旅游目的地的轉變。

Through the overall research of the study scope, the tenderer shall focus on sorting out the connection between the botanical garden and Tietou Mountain, the urban axis of South Lake, the hub of South Railway Station and the surrounding open space, and shall skillfully construct the slow corridor and urban vitality zone connected with each other, especially the corridor between Qingliang Mountain, Chengmen Mountain and the urban axis of South Lake, making it an organic part of the botanical garden as a whole. The tenderer shall also integrate the urban functions of the area, such as the exhibition center, art center and historical district, and proposes the "layout, construction and operation" of the botanical garden, which is in line with the "garden-city integration" and "one garden and two districts". "At the same time, the concept of plant biodiversity shall be introduced into other public open spaces in the area to build a pan-botanical garden ecological tour area in Sanjiangkou, which shall eventually form a globally unique Sanjiangkou city living room with rich biodiversity, livability and characteristics. The tender shall formulate feasible transportation connection mode, land adjustment strategy, operation management mode and tourism development path, so that the botanical garden construction can improve and seek common development with Sanjiangkou area, and promote the transformation of Sanjiangkou area from a transportation hub to a world-class tourism destination.

2)植物園功能定位與發展策略

iiFunctional positioning and development strategy of the botanical garden

通過對國內外重要植物園及本地區植物專類公園的競合分析,結合本項目地理、氣候、立地條件分析,提出三江口植物園的差異化發展方向,明確定位,展現特點,從植物種類、展陳方式、特色資源和風景特色等多元方向精準定位三江口植物園的目標,并通過特色專類園、數字植物園、文旅植物園等多種建設方式,打造一個開放多元國際一流的植物園。

By analyzing the competition of important botanical gardens at home and abroad and the botanical special gardens in the region, combined with the analysis of the geography, climate and site conditions of this project, the tender shall propose the differentiated development direction of Sanjiangkou botanical garden, clarify the positioning, show the characteristics, accurately locate the goal of Sanjiangkou botanical garden from multiple directions such as plant species, exhibition methods, characteristic resources and landscape characteristics, and build an open, diversified and international first-class botanical garden through various construction methods such as characteristic special garden, digital botanical garden and cultural and tourism botanical garden.

3)植物園總體設計

iiiOverall design of the Botanical Garden

通過對項目所在區域地理、氣候條件與本底建設條件的調查評估,依托三江口片區特有的山、水、新城格局,緊扣植物園功能定位,明確植物園的山水本底特色與功能分區,并根據植被區系特點、地方特色、場地條件以及植物的生態習性、觀賞特性等要求對植物園空間進行總體布局,使其能夠在充分發揮本底優勢的前提下,實現科學研究、生態修復、科普教育、休閑娛樂的多重目標,打造獨具特色的山水城市風景式植物園。

Through the investigation and evaluation of the geography, climatic conditions and background construction conditions of the project area, relying on the unique pattern of mountains, water and new town in Sanjiangkou area and closely focusing on the functional positioning of the botanical garden, the landscape background characteristics and functional division of the botanical garden should be defined, and the overall layout of the botanical garden space shall be carried out according to the requirements of vegetation flora characteristics, local characteristics, site conditions, ecological habits and ornamental characteristics of plants. Under the premise of giving full play to its background advantages, the multiple objectives of scientific research, ecological restoration, popular science education and leisure and entertainment shall be realized, creating a unique landscape botanical gardening a landscape city.

4)生境保護與營造設計

ivHabitat protection and design

通過對選址范圍內水文、土壤、植被、地形、光照等的調查評估,明確植物園已具備的或潛在的生境類型,在此基礎上,以生態保育與生境營造為重點,提出植物園應具備的生境類型與生境營造策略,使山地、濕地充分發揮其生態效益,營造豐富且具有本土特色的植物園生境,從而充分彰顯植物園的生物多樣性。

Through the investigation and assessment of hydrology, soil, vegetation, topography and light within the site, the existing or potential types of habitats in the botanical garden shall be clarified. On this basis, with the focus on ecological conservation and habitat constuction, the types of habitats and habitat construction strategies that shall be available in the botanical garden shall be proposed so that the mountains and wetlands can give full play to their ecological benefits and create a rich botanical garden habitat with local characteristics, thus the biodiversity of botanical gardens can be fully manifested.

5)專類園總體布局

vOverall layout of the special garden

為實現“園與城”的融合,植物園擬采取“園中之園”模式建設,方案應結合植物園定位與特色,提出特色鮮明、價值突出的植物專類園類型,并結合立地條件進行專類園布局,如依托現有清涼山公園建設杜鵑專類園、依托城門山茉莉花田建設市花園等,實現植物園的公共性,從而更好地引領三江口片區建設。

In order to achieve the integration of "garden and city", the botanical garden shall be built in the mode of "garden within a garden". The plan shall combine the positioning and characteristics of the botanical garden, put forward distinctive and valuable types of plant special gardens, and carry out the layout of special gardens by considering the site conditions, such as relying on the existing Qingliang Mountain garden to build a special garden for azaleas, or relying on the jasmine fields in Chengmen Mountain to build a city garden, so as to realize the public nature of the botanical garden and better lead the construction of the Sanjiangkou area.

6)植物園生態旅游策劃

viBotanical garden ecotourism planning

引入可持續運營發展理念進行規劃設計,以植物園優良的生態環境為依托,在不超過植物園承載力的前提下,策劃植物展陳主題、開發生態旅游活動與路線,建造可自身造血的文旅植物園,實現長久的可持續發展。此外,綜合考慮片區的會展中心、藝術中心、歷史街區等城市功能區,聯動植物園周邊區域旅游資源為三江口片區旅游開發提出思路。

By introducing the concept of sustainable operation and development for planning and design, relying on the excellent ecological environment of the botanical garden, and on the premise of not exceeding the carrying capacity of the botanical garden, the tenderer shall plan the theme of plant exhibition, develop ecotourism activities and routes, and build a cultural and tourism botanical garden that can generate own value, so as to realize long-term sustainable development. In addition, the tenderer shall consider the exhibition center, art center, historical block and other urban functional areas in the area, link the regional tourism resources around the botanical garden, and put forward ideas for the tourism development of Sanjiangkou area.

7)道路交通及慢行系統設計

viiRoad traffic and slow traffic system design

落實上位規劃和相關專項規劃,提出“一園兩區”間慢行系統的連接方式,巧妙構建相互之間連接的慢行廊道及城市活力帶,尤其是清涼山、城門山與南湖城市軸線之間的通廊,使之成為植物園整體有機組成的部分。并在園區內設置科研、游覽有序結合的交通體系,合理布局游覽性道路設計和交通組織,滿足園區游人量和景點容量需求;對外部交通的銜接、停車設施等提出配置建議。

The superior plan and related special plans shall be implemented, the connection of the slow traffic system between "one garden and two districts" shall be proposed, the construction of a slow corridor and urban vitality belt connecting each other shall be conducted skillfully, especially the corridor between Qingliang Mountain, Chengmen Mountain and the urban axis of South Lake, so that it can become an organic part of the Botanical Garden as a whole. The transportation system that combines scientific research and sightseeing in an orderly manner in the garden shall be set up, the design and traffic organization of the sightseeing roads to meet the demand for the number of visitors and the capacity of the attractions in the garden shall be reasonably laid out; recommendations on the configuration of the external traffic connection and gardening facilities shall be made.

8)建筑概念方案設計

viiiArchitectural concept design

統籌協調福州氣候條件、地帶性植物分布、功能要求、空間布局、植物生長環境模擬、設備系統等內容,論證植物溫室、冷室建設的必要性及可行性,在此基礎上提出建筑的概念方案設計,確定溫室、展覽館的結構和形式,創造植物適宜的生存空間和游人舒適的游覽環境,并充分利用風、水、地熱、太陽能等綠色能源,減少建設投資和降低運營成本。同時植物園其他主要建筑包括科普教育建筑、科研建筑、管理建筑等根據總體方案需求進行合理布局,并完成主要建筑的概念性方案。

Fuzhou's climate conditions, distribution of zonal plants, functional requirements, spatial layout, plant growth environment simulation, and equipment systems shall be coordinated, the necessity and feasibility of building plant greenhouses and cold rooms shall be demonstrated, and on this basis, the conceptual scheme design of the building shall be proposed, the structure and form of greenhouses and exhibition halls shall be determined, a suitable living space for plants and a comfortable tour environment for visitors shall be created, and the tenderer shall make full use of wind, water, geothermal, solar energy and other green energy, reduce construction investment and operating costs. Meanwhile, other major buildings of the botanical garden including science education buildings, scientific research buildings, and management buildings shall be reasonably laid out according to the needs of the overall scheme, and the conceptual schemes of the major buildings shall be completed.

9)分期發展規劃

ixPhased development planning

重點分析三江口的規劃,銜接片區建設時序,確定分期建設的計劃,綜合考慮交通、資金、特色展示、城區建設銜接等因素,合理比選啟動區(一期項目,不少于100公頃),并完成植物園一期方案設計。

By analyzing the planning of Sanjiangkou, the timing of the construction of the area shall be articulated, the plan of phased construction shall be determined, factors such as transportation, funding, feature display, and urban construction connection shall be taken into account, the start-up area (Phase I project, no less than 100 hectares) shall be reasonably compared, and the design of the first phase of the botanical garden program shall be completed.

(10)植物園一期方案設計

xBotanical Garden Phase I Program Design

確定植物園啟動區后,進行一期項目方案設計,最終成果應達到方案設計的深度。根據植物園功能定位、相關規劃、場地現狀等完成現狀條件分析、規劃總平面圖、各項專業規劃圖、豎向規劃圖、反應規劃設計意圖的效果圖等內容。

After determining the starting area of the botanical garden, the schematic design of the first phase of the project shall be carried out and the final result shall reach the depth of the schematic design. The analysis of the current conditions, the general layout plan, various professional plans, vertical plans, renderings reflecting planning and design intentions shall be completed according to the functional positioning of the botanical garden.

11植物園建設運營管理體系設計

xiBotanical garden construction and operation management system design

引入可持續運營發展理念進行規劃設計,以5A級景區為參考,提出植物園可持續運營的有效途徑,如相關基礎配套設施和游覽設施的設置、政府企業合作運營方式、科普與文、體、商、旅的結合、科研和產業相互輔助等籌集資金、創造收入,并通過投融資、建設、運營管理費用的估算明確植物園所能達成的經濟效益,使植物園實現健康良性的運行,實現長久的可持續發展。

By introducing the concept of sustainable operation and development for planning and design, and taking 5A scenic spots as a reference, the effective ways for the sustainable operation of the botanical garden shall be put forward, such as the setting of relevant infrastructure and tourist facilities, the cooperative operation mode of government and enterprises, the combination of popular science and culture, sports, business and tourism, the mutual assistance of scientific research and industry, etc. Raise funds and generate income, and the tenderer shall clarify the economic benefits that the botanical garden can achieve through the estimation of investment, financing, construction, operation and management costs, so as to make the botanical garden realize healthy and benign operation and long-term sustainable development.

3、國際招標范圍及內容

III. The scope and content of international tender

1概念性總體規劃方案階段完成福州市三江口植物園概念性總體規劃方案;

iConceptual master plan phase: complete the conceptual overall plan of Sanjiangkou Botanical Garden in Fuzhou.

2方案深化階段中標單位整合各家入圍方案,完成福州市三江口植物園概念性方案總體規劃優化,總體規劃達到修建性詳細規劃的深度。植物園一期達到方案設計的深度。

iiScheme deepening phase: the winning tenderer shall integrate each shortlisted schemes and complete the optimization of the conceptual master plan of Sanjiangkou Botanical Garden in Fuzhou City, and the plan shall reach the depth of the detailed construction plan. Phase I of the Botanical Garden shall reach the depth of the schematic design.

(三)本公告的規劃設計內容中所提供的相關規劃數據在資格入圍答疑階段若有調整,各投標單位需充分響應。

IIIIf the relevant planning data provided in the planning and design content of this announcement is adjusted during the Q&A stage of the qualification shortlist, all bidders shall fully respond.

三、招標方式III. Tender mode

本次招標活動包括資格入圍和方案評選兩個階段。

The tender includes two stages of qualification shortlisting and scheme selection.

(一)資格入圍階段。通過公開報名的方式招募國內外優秀設計單位,通過資格及概念提案評選確定入圍名單,允許以聯合體形式投標。投標單位需要提供包括資質水平、主創設計師及團隊成員、業績證明等能表現團隊設計實力的相關證明材料,并提出方案設計的簡要思路。最終由專家評選出 5 家投標單位進入下一階段的方案評選。若投標單位數量或入圍投標單位數量未達要求,主辦單位保留終止招標的權利。

(i)Qualification shortlisting stage. Excellent design companies from home and abroad shall be recruited through open application, and the shortlist shall be determined through qualification and concept proposal selection, and allow bidding in the form of consortium. The tendering company shall provide relevant supporting materials including qualification level, chief designer and team members, proof of performance, etc. that can show the design strength of the team, and present a brief idea of the program scheme design. Five tenderers will be selected finally by the experts to proceed to the next stage of proposal selection. If the number of tendering companies or the number of shortlisted tendering companies does not meet the requirements, the organizer shall reserve the right to terminate the tender.

(二)方案評選階段。由入圍的投標單位按照《福州市三江口植物園方案設計任務書》要求提交方案設計成果。由主辦單位組織專家進行方案評選推薦排名,上報市政府研究確定名次,委托第一名中選設計單位開展后續方案整合和深化工作。方案深化可吸取各投標方案優點,同時按照市政府、指揮部、專家評審等各方意見深化細化整合為一版具有整體性和獨創性的設計方案,指導規劃實施。

(ii)Program selection phase. The shortlisted tenderers shall submit the program design results in accordance with the requirements of the "Fuzhou Sanjiangkou Botanical Garden Program Design Task Book". The organizer will organize experts to select and recommend the ranking of the program, submit to the municipal government to determine the final ranking, and entrust the first selected design company to carry out subsequent program integration and deepening work. The scheme deepening should draw on the advantages of each tendering scheme. At the same time, according to the opinions of the municipal government, headquarters, expert review and other parties, deepen the refinement and integration into a comprehensive and original design scheme to guide the planning and implementation.

四、招標要求IV. Tender requirements

(一)本次招標活動采用公開報名方式,境內外設計單位均可報名參加,允許聯合體報名,聯合體成員數量不超過3家。不接受自然人及自然人組合的報名。聯合體各方不得再單獨以自己名義,或者與另外的投標單位組成聯合體參加投標。

(i)The tender is open to the public. All domestic and foreign design companies are allowed to participate in the bidding, and the number of consortium members shall not be more than 3. This project does not accept an individual’s or an assembly of individuals’ registration. All parties shall not form a consortium to participate in the bidding in their own name or with other bidders.

(二)本次國際招標不設資質要求,但投標單位應具有近10年內承接過用地面積不少于100公頃的植物園類似項目,并提供設計合同業績證明材料,國內外注冊并在有效期內具有上述業績的合法獨立法人企業或機構均可報名參加。法定代表人為同一個人的兩個及兩個以上法人,母公司、全資子公司及其控股公司,不得同時報名參賽。

(ii)There is no qualification requirement for this international bidding, but the bidder should have undertaken similar botanical garden projects with a land area of no less than 100 hectares in the past 10 years, and provide the design contract performance certification materials.All legal independent corporate enterprises or organizations registered at home and abroad and have the above achievements within the validity period can sign up. Two or more legal persons whose legal representatives are the same person, parent company, wholly-owned subsidiary and its holding company, may not register for the competition at the same time.

(三)鼓勵投標單位跨界聯合,融合城市規劃設計、景觀設計、建筑設計、運營策劃、產業與功能策劃等不同經驗的團隊。

(iii)Tendering companies are encouraged to join forces across borders and integrate teams with different experiences in urban planning and design, landscape design, architectural design, operation planning, industrial and functional planning, etc.

(四)考慮到新冠疫情對國際航班等的影響,在中國境內無分支機構的境外投標單位必須與境內投標單位組成聯合體參加投標。

(iv)Considering the impact of the Covid-19 epidemic on international flights, etc., overseas tendering companies without branches in China shall form a consortium with domestic tendering companies to participate in the tender.

(五)參與本次招標活動的主創設計師須主持過多個同類項目,具有10年以上相關工作經驗,且須全過程參與本次活動,包括成果匯報、評審答疑(含視頻會議)等重要環節工作。如在本次招標活動過程中發現主創設計師與資格預審申請文件材料所提交的人員名單不符,主辦單位有權取消其投標資格。

(v)The chief designers participating in the tender shall preside over several similar projects, designers shall have more than 10 years of relevant work experience, and shall participate in this tender in the whole process, including important links such as results reporting, review and answering questions (including video conference). If it is found in the bidding process that the chief designer is inconsistent with the list of personnel submitted in the prequalification application documents, the organizer has the right to cancel its bidding qualification.

(六)參與本次招標活動的專業技術人員須為該投標單位在冊人員,為了保證項目團隊人員對中國地區背景和相關要求的準確理解,境外投標單位的專業技術人員團隊中應至少有一名通曉漢語人士。

(vi)The professional and technical personnel participating in the tender shall be the registered personnel of the tendering company. In order to ensure that the project team members have an accurate understanding of the background and relevant requirements of the Chinese region, project planning and design personnel should include at least one person who is proficient in Chinese and has an intermediate professional title or above.

(七)投標單位應按上述要求參與本次招標活動,否則主辦單位有權取消其投標資格。除上述條款外,當本次招標活動主辦單位提出合理要求時,投標單位應繼續補充提供符合相應要求的資格證明文件。

(vii)The bidder shall participate in this bidding activity according to the above requirements, otherwise the organizer has the right to cancel its bidding qualification. In addition to the above terms, when the organizer of this tender makes reasonable requests, the tenderer should continue to provide additional qualification documents that meet the corresponding requirements.

(八)具備以下條件的投標單位優先考慮:

(viii)Priority shall be given to tendering companies with the following conditions:

具有多個同類植物園項目特點的規劃設計經驗;

Planning and design experience of similar botanical garden projects;

由承接過同類項目的國內外院士或大師擔任主創設計師的投標單位;

Tendering companies with domestic and foreign academicians or masters who have undertaken similar projects as the chief designers;

項目主創設計師獲得相關行業國際或國內大獎。

The chief designer of the project has won international or domestic awards in related industries.

五、費用設置V. Design Fee & Honorarium

本次招標活動對資格入圍且參與方案評審的五家投標單位支付設計費用(含稅):

The tender pays the design fee (including tax) to the five tenderers who are qualified to be shortlisted and participate in the evaluation of the proposal:

第一名:中標單位將獲得項目方案設計合同資格,待完成項目方案整合和優化深化后,最終可獲得方案設計編制費用合計人民幣400萬元。

First place: The winning tenderer shall be qualified for the project scheme design contract, and shall eventually receive a total of RMB 4,000,000 for the scheme design preparation after the project scheme integration and optimization and deepening are completed.

第二名:獲得補償費用人民幣80萬元;

Second place: compensation fee of RMB 800,000.

第三名:獲得補償費用人民幣60萬元;

Third place: compensation fee of RMB 600,000.

第四名和第五名:各獲得補償費用人民幣40萬元。

Fourth and fifth place: compensation fee of RMB 400,000 for each.

資格比選階段未入圍投標單位不獲得補償費。

No compensation fee shall be paid to the unsuccessful tenderers in the qualification phase.

注:本項目的設計費和補償費不因主辦單位調整城市規劃或方案設計規模而調整,投標單位需充分響應。投標單位參加本次招標活動產生的所有費用(含差旅住宿費)均自行承擔。

Notes: the design fee and compensation fee of this project shall not be adjusted due to the adjustment of urban planning or scheme design scale by the organizer, and the tenderers shall give fully respond. All costs (including travel and accommodation) incurred by the tenderers to participate in the tender shall be borne by themselves.

六、時間計劃VI. Time Schedule

本次招標活動共分為資格入圍和方案評選兩個階段,具體時間計劃安排如下:

The tender is divided into two stages of qualification shortlisting and scheme selection, and the specific time schedule is as follows:

階 段

Stage

計劃時間

Program Time

事 項

Item

第一階段

Phase I

資格入圍

Qualification shortlisting

2022年05月13日17:30時

17:30 on May 13th, 2022

投標單位報名截止

Application deadline

2022年05月25日17:30時

17:30 on May 25th, 2022

資格預審申請文件提交截止

Pre-qualification application documents submission deadline

2022年05月26日

May 26, 2022

召開資格預審會

Pre-qualification meetings are held

2022年05月27日

May 27, 2022

公布資格預審結果,向入圍投標單位發出邀請函

Announcement of pre-qualification results and issuance of invitation letters to shortlisted tendering companies

第二階段

Phase II

方案評選

Program Selection

2022年06月01日

June 01, 2022

召開項目發布會、現場踏勘、答疑等

Project launch, site survey, Q&A, etc.

2022年07月28日

July 28, 2022

方案設計階段、設計成果文件提交截止

Schematic design phase,deadline for submission of design result documents

2022年07月29日

July 29, 2022

召開方案設計評審會

Hold a review meeting of the design projects

 

注:以上時間以北京時間為準,主辦單位保留對具體時間節點作適時調整的權利。

Notes: The above time is based on Beijing time, and the organizer shall reserve the right to adjust the specific time points in due course.

七、報名方式VII. How to Apply

(一)投標單位下載報名表格(報名表格附件可在招標網http:///index.html、中國招標投標公共服務平臺http://bulletin.cebpubservice.com/、中國城市規劃學會網http://www.planning.org.cn/、福州市建設工程電子招投標交易平臺https://www.fzztb.com/、福建省公共資源交易電子公共服務平https://ggzyfw.fujian.gov.cn/、中國政府采購網http://www.ccgp.gov.cn/下載),填寫后發送至郵箱qzzxzx@163.com,組織單位收到報名表后,將以郵件方式回復資格預審相關文件。報名截止時間為:2022年05月13日17:30時。逾期遞交或不符合規定的報名信息恕不接受。

(I)Tendering companies download the application form (the application form attachment can be found on the China Procurement and Tender Network http:///, China Tender Public Service Platform http://bulletin.cebpubservice.com/, China Urban Planning Society Network http://www.planning.org.cn/, Fuzhou City Construction Engineering Electronic Tender Platform https://www.fzztb.com/, Fujian Province Public Resources Transaction Electronic Public Service Platform https://ggzyfw.fujian.gov.cn/, Chinese Government Procurement Website http://www .ccgp.gov.cn/download), after the form is filled, pls submit it to qzzxzx@163.com, after the organizational company receives the application form, it shall reply to the pre-qualification related documents by email. The deadline for registrationis: 17:30 on May 13th, 2022. Late submission or non-compliant registration information shall not be accepted.

資格預審申請文件報名文件匯總表以excel格式于2022年0525日17:30前發送至郵箱qzzxzx@163.com。

The application document summary form of prequalification application documents shall be sent to qzzxzx@163.com in excel format before 17:30 on May 25, 2022.

(二)資格預審申請文件須嚴格按照相關要求制作,遞交資格預審申請文件包括現場遞交和快遞郵寄兩種方式。

(II)Pre-qualification application documents shall be made in strict accordance with the relevant requirements, and the submission of pre-qualification application documents includes two ways: on-site submission and express mail.

1、以現場遞交時,需持法定代表人授權委托書;若以聯合體形式的,需持聯合體牽頭設計單位法定代表人授權委托書。

1. To submit on site, the tenderer shall hold the legal representative authorization letter;if in the form of a consortium, the tenderer shall hold the legal representative authorization letter of the lead design company of the consortium.

2、以快遞郵寄方式遞交時,請預留足夠的快遞運輸時間,以材料送達時間為準。投標單位應做好快遞包封工作,例如利用紙箱或泡沫箱進行包封。郵寄過程中發生資料損壞、丟失等情形造成的后果,由投標單位自行承擔。

2. When submitting by express mail, please allow enough express delivery time for the material to be delivered. Tendering companies shall do a good job of express wrapping, such as using cartons or foam boxes for wrapping. The consequences caused by damage or loss of information during the mailing process shall be borne by the tendering company itself.

(三)遞交資格預審申請文件的時間及地點:投標單位需于2022年05月25日17:30時前將資格預審申請文件的書面文件遞交到下述指定地點。資格預審申請文件遞交地址:***

(III)Time and place to submit the pre-qualification application documents: Tendering companies are required to submit the written pre-qualification application documents to the following designated place before 17:30 on May 25th, 2022. Pre-qualification application documents submitted to: Biding Room, 11th Floor, Chengtou Building, No. 15 Taijiang Road, Taijiang District, Fuzhou City, Fujian Province. Receive pre-qualification application documents for working days Beijing time 09:00-17:30, late submission of pre-qualification application documents shall not be accepted.

(四)資格預審結果通知:在確定入圍投標單位名單后的3個工作日內,以公告形式公布入圍投標單位評選結果。

(IV)Pre-qualification results notification: Within 3 working days after determining the list of shortlisted tendering companies, the selection results of shortlisted tenderers will be announced in the form of announcement.

(五)聯系人與聯系方式***

(IV)Contact person and contact information: Miss Chen 15805975918; Mr Sun 0591-87277022

電話咨詢時間:工作日上午08:30-12:00,下午14:30-17:30(北京時間)

Telephone consultation time: 08:30-12:00, 14:30-17:30 (Beijing time) on weekdays

E-mail:qzzxzx@163.com

八、資格預審文件VIII. Pre-qualification Documents

資格預審申請文件由報名文件和概念提案兩部分組成,須分別獨立成冊。

The pre-qualification application document consists of two parts: the registration document and the concept proposal, which shall be in separate volumes.

(一)報名文件內容要求

(I)Requirements of the content of the registration documents

A4 規格(210mm×297mm),1 正7 副,不超過40 張單頁紙內容(雙面打印,頁碼只到80,頁數限制不含封面封底扉頁和目錄),膠裝。

A4 size (210mm × 297mm), 1 original and 7 copies, no more than 40 single-page paper content (double-sided printing, page number only to 80, page limit does not include the front and back cover title page and table of contents), adhesive binding.

(1)福州市三江口植物園方案設計國際招標項目投標單位報名表

(i)Application form for tenderers of the international tender project for the design of Sanjiangkou Botanical Garden in Fuzhou City

(2)投標聲明

(ii)Tender statemen

(3)聯合體協議書

(iii)Consortium agreement

(4)營業執照或有效機構注冊文件等資質證明文件

(iv)Business license or valid agency registration documents and other qualification documents

(5)法定代表人身份證明、法定代表人授權委托書

(v)The identity of the legal representative, the legal representative of the power of attorney

(6)投標單位基本情況及簡介表

(vi)Basic information and brief introduction of the tendering company

(7)項目團隊人員名單匯總表

(vii)Summary of project team personnel list

(8)項目主創設計師簡歷表

(viii)Project chief designer resume form

(9)項目團隊人員簡歷表

(ix)Project team personnel resume form

(10)類似項目經驗總表

(x)Summary table of similar project experience

(11)其他材料

(xi)Other materials

具體要求詳見招標文件第六部分 資格預審申請文件格式。

Specific requirements are detailed in Part VI of the tender documents pre-qualification application document format.

(二)概念提案為A3橫版圖文排版設計文本,1 正7 副,單面彩色打印,不超過30頁(不含封面封底)。內容包括但不限于以下:

(II)The concept proposal is an A3 horizontal layout design text, 1 original and 7 copies, printed in color on one side, shall not be more than 30 pages (excluding the front and back covers). Content includes, but is not limited to:

(1)對項目的理解、重點解決問題、工作思路及規劃設計理念;

(i)Understanding of the project, key problems solving, working ideas and planning and design concepts;

(2)對項目技術路線、發展目標、發展策略的描述;

(ii)A description of the project's technical route, development goals, and development strategies;

(3)對項目的總體想法和總體空間結構;

(iii)General idea of the project and general spatial structure;

(4)對項目未來空間特色的描述或局部設計;

(iv)A description or partial design of the future spatial characteristics of the project;

(5)團隊組織分工、時間節點計劃等;

(v)Team organization division of labor, time point plan, etc.;

(6)具有參考價值的案例及其與本項目關聯內容的相關分析;

(vi)Cases with reference value and their relevant analysis of the content associated with this project;

(7)投標單位過去的設計項目中可以借鑒的內容與做法。

(vii)The content and practices that can be learned from the past design projects of the tenderer.

注意事項

Cautions

 

  • 資格預審文件應由投標單位的法定代表人或者其授權的代表簽字并加蓋公章(或電子章)、騎縫章,如由后者簽字,應提供“法定代表人授權委托書”。

 

(i)Pre-qualification documents shall be signed and affixed with the official seal (or Electronic seal) and seam seal by the legal representative of the tendering companies or its authorized representative; if signed by the latter, the "Legal Representative's Authorization Letter" shall be provided.

 

  • 全套資格預審文件的正本和全部副本均應使用不能擦去的墨料或墨水打印、書寫或復印,并由法定代表人或其授權的代表簽署,蓋投標單位公章(或電子章)。資格預審文件應無涂改和行間插字,除非這些改動是根據文件的指示進行的,或者是為改正投標單位造成的必須修改的錯誤而進行的。有改動時,修改處應由授權的代表簽署證明或加蓋校正章。

 

(ii)The original and all copies of the full set of pre-qualification documents shall be printed, written or photocopied using ink or ink that cannot be erased, and shall be signed and affixed with the official seal(or Electronic seal) of the tendering company by the legal representative or its authorized representative. The pre-qualification documents shall be free of alterations and interlinear insertions, unless such alterations are made in accordance with the instructions of the documents or to correct errors caused by the tender entity that shall be corrected. In case of changes, the changes shall be certified by the authorized representative's signature or stamped with a corrective seal.

 

  • 資格預審文件中所有的資格標準證明文件均須在有效期內,加蓋投標單位公章(或電子章)。否則資格預審文件在符合性檢查中將被視為無效投標。

 

(iii)All qualification criteria supporting documents in the pre-qualification documents shall be valid and stamped with the official seal(or Electronic seal) of the tendering company. Otherwise, the pre-qualification documents shall be considered invalid in the conformity check.

 

  • 如為聯合體投標,聯合體各成員的資格預審申請文件均須分別加蓋各自的單位公章(或電子章)、騎縫章。

 

(iv)In case of joint tendering, the pre-qualification application documents of each member of the consortium shall be stamped with their respective official seal(or Electronic seal) and seam seal.

 

  • 資格預審申請成冊文件均須制作目錄并標注頁碼。

 

(v)The pre-qualification application documents must be made into a catalog and marked with page numbers.

 

  • 資格預審申請文件報名材料語言必須以中文為主,存在必須使用英文或其他外文,須提供中英文對照格式,中英文不一致之處,以中文為準。

 

(vi)Pre-qualification application documents registration materials language shall be mainly in Chinese, if English or other foreign languages are necessary, both Chinese and English versions shall be provided. In the event of any discrepancy between the Chinese and English, the Chinese version shall prevail.

 

  • 未按本須知規定的格式填寫資格預審文件、資格預審文件字跡模糊不清的,其投標無效。

 

(vii)If the pre-qualification documents are not filled out in the format specified in these instructions, or if the pre-qualification documents are illegible, their tenders will be invalid.

九、發布平臺IX. Information Release Platform

正式公告在招標網http:///index.html、中國招標投標公共服務平臺http://bulletin.cebpubservice.com/、中國城市規劃學會網http://www.planning.org.cn/、福州市建設工程電子招投標交易平臺https://www.fzztb.com/、福建省公共資源交易電子公共服務平https://ggzyfw.fujian.gov.cn/、中國政府采購網http://www.ccgp.gov.cn/發布。本公告中如有中、英文不一致之處,以中文為準。

The official announcement is available on the China Procurement and Tender Network http:///, China Tender Public Service Platform http://bulletin.cebpubservice.com/, China Urban Planning Society Network http://www.planning.org.cn/, Fuzhou City Construction Project Electronic Tender and Tendering Trading Platform https://www.fzztb.com/, Fujian Province Public Resources Transaction Electronic Public Service Platform https://ggzyfw.fujian.gov.cn/, and the Chinese Government Procurement Website http://www.ccgp.gov.cn/. If there is any inconsistency between Chinese and English in this announcement, Chinese shall prevail.

 

主辦單位

Hosted by:

福州市建設發展集團有限公司

Fuzhou Construction & Development Co.,LTD

組織單位

Organized by:

泉州市工程咨詢中心有限公司

Quanzhou Engineering Consulting Center Co.,Ltd    

 

十一、凡對本次資格預審提出詢問,請按以下方式聯系

1.采購人信息

名 稱:福州市建設發展集團有限公司     

地址:***

聯系方式***

2.采購代理機構信息

名 稱:泉州市工程咨詢中心有限公司            

地 址:***

聯系方式***

3.項目聯系方式

項目聯系人***

電 話:***

 

 

 

地區導航
  • 華東: 上海 江蘇 浙江 安徽 福建 江西 山東
  • 華北: 北京 天津 河北 山西 內蒙古
  • 東北: 遼寧 吉林 黑龍江
  • 華南: 廣東 廣西 海南
  • 西北: 陜西 甘肅 青海 寧夏 新疆
  • 西南: 重慶 四川 貴州 云南 西藏
  • 華中: 河南 湖北 湖南
  • 關于我們 | 成功案例 | 知名客戶 | 誠聘英才 | 廣告服務 | 友情連接 | 幫助中心 | 網站地圖 | 手機版 | 招標導航
    客戶咨詢:400-633-1888      信息發布電話:13030031390    傳真號碼:010-59367999       總部地址:北京市海淀區中關村大街11號7層(100190)
    北京智誠風信網絡科技有限公司   北京中招國聯科技有限公司   北京中招國聯咨詢有限公司   北京國建偉業咨詢有限公司  哈爾濱中招國聯科技有限公司  石家莊易投網絡科技有限公司
    Copyright © 2005-2024 版權所有  招標網 京ICP證050708號-1 證書  京公網安備 11010802028602號
    国产精品久久久久精品日日-国产精品老女人一级片在线播放-无码av综合在线新免费看-免费黄色视频在线观看毛片